Otto Miller Park Invitation to Bid: May 11th, 2021   Invitation to Bid:   The Village of Hortonville has contracted BNH Lighting to design, develop and project manage the electrical work being done at Otto Miller Park located at 135 John St. Work will begin around August 1, 2021 through November 2021.   The Village of Hortonville invites you to bid the implementation of the electrical work. A mandatory walk through will be May 18th, 2021 at 8 am. Bids will be due to BNH Lighting by Noon on May 25th, 2021.   1.       Disconnecting, re-wiring, and relocating the 2- electrical panels on the exterior north wall of the concession stand building to the interior same wall they currently are mounted on. Use existing feeder wires. New feeder wires not needed. 2.       Install wire way junction box on the exterior wall to feed all the field lighting, 3- shed feeder wires, scoreboard power wires and sprinkler piping needed to be feed into the building. 3.       Install an approximate size of 3x3 junction box, 3 feet up on a pipe assemble, outside the fence next to the north shed. From that junction box, we will be wiring each scoreboard, the outfield light poles, the west green shed, along with the north shed. We will also be providing a spare 2 inch conduit at this location for future needs from the concession stand. 4.       Provide a 20 amp circuit to the north shed and hook up existing circuits. (Pending).. 5.       Provide a 100 amp service with an 8 circuit panel at the west green shed in a 2 inch conduit. Hook up current branch circuit wiring at the shed. 6.       Provide a 100 amp service with an 8 circuit panel at the west batting cage shed in a 2 inch conduit. Install breakers and wiring for batting cage machine and 1- receptacle circuit. 7.       Provide piping and wiring to each ball field light poles according to the new fixture specified wattage. Provide a junction disconnect box at each light pole with fuses and a receptacle on each of the 8 infield poles. 8.       Provide a 1 inch pipe for low voltage wiring at 4 infield poles. 9.       Provide galvanized 90 degree sweeps when any piping goes vertical from the ground. This will last forever and eliminate any wires burning through PVC when pulling wires. Install expansion sleeves for existing ground connections. 10.   Approximately 3,500 feet of PVC pipe, with connectors, budgeted to accommodate proper wire size. 11.   Provide ground wiring to ground rods at each light pole and proper grounding at each electrical panel.   Let me know if you will be attending the mandatory walk through by May 14th, 2021, noon.   If you have any question or concerns, please call me at 920-213-8693.   Sincerely,     Jeremy Bellile BNH Lighting, LLC 313 E. Main St. Hortonville, WI. 54944

Generic selectors
Exact matches only
Search in title
Search in content

TEST TW WEATHER

Commissions

VILLAGE COMMISSION AND COMMITTEES FOR 4/2018 THROUGH 4/2019

PLANNING & ZONING

Village President - Jeanne Bellile
Village Trustee - Julie Arendt Vanden Heuvel
Terry Ellenbecker
Barry Hoff
Richard Gruenewald
Mike Bellile
Roger Retzlaff
Tom Banker
Dave Moe
Appointed / 3-year term

Village Attorney, consultant
Village assigned Engineer, consultant

TERM EXPIRES:
Term of Office
Term of Office
2020
2020
2020
2022
2022
2022
2020

LIBRARY BOARD
Village Trustee - Pat Lund-Moe
School District Representative - Todd Timm
Alexis Jandourek
Kay Forton
Mike Wirkus
Veronica Woodward
Jenna Foth
Appointed  / 3-year term  (July)

HEALTH OFFICER
County Health Officer - Melody Bockenfeld

.
Term of Office
Term of Office
2021
2020
2022
2021
2022

HORTONVILLE-HORTONIA FIRE DISTRICT BOARD
James Moeller -Village Board Representative
Jaime Mullock- Village Resident
Appointed / 2-year term (April)
VILLAGE ASSESSOR
Bowmar Appraisal - Nick Marcks


Term of Office
2021

ZONING BOARD OF APPEALS
Joanne Mueller
Kathy Gruenewald
Robert Riemer
Thom Ciske
Deb Obry
1st Alternate- Jaime Mullock
2nd Alternate- Michael Hanson
Appointed  / 3-year term
BOARD OF REVIEW
Village President - Jeanne Bellile
Village Clerk/Treasurer - Jane Booth
Trustee - Peter Olk
Trustee Alternate - Dan Nejedlo

2021
2022
2020
2020
2022
2021
2022
RESIDENTIAL REHABILITATION
Jason Bloxham
Lillian Baker
Garry Beck
Jeff Middlestead
Matt Schroeder
Appointed  / 1-year term

2019
2019
2019
2019
2019
Appointed  / 3-year term
SENIOR ACTIVITIES 
Pat Lund-Moe- Trustee
Vicki Bero - Staff
Jane Booth - Staff
Rosemary Gorski  - citizen
Verna Zimmerman - citizen
Lenard Epps - citizen
Karen Dickrell - consultant member
Vacant  - consultant member
WEED COMMISSIONER

Vacant

VILLAGE ATTORNEY
Robert Sorenson

 

 

 

BUILDING INSPECTOR
Paul Hanlon

VILLAGE ENGINEERING POOL
Cedar Corp. - Dennis Steigenberger
MSA – Al Geurts
McMahon Associates - Ron Wolf

ECONOMIC DEVELOPMENT
Village President - Jeanne Bellile
Village Trustee - Dan Nejedlo
Financial Institution - Jason Bloxham
Chamber of Commerce - Jill Kramer
Industrial Business - Jayne Frazier
Small Business - Greg Rogers
Village Resident - Mark Voight

CAPITAL IMPROVEMENTS PLANNING
Village Administrator
Village Director of Public Works
Village Chief of Police
Village Library Director
Village Clerk-Treasurer